HomeMy WebLinkAbout0123002-Building (interior demo)
o
OSHKOSH
ON THE WATER
Job Address 1624 DOEMEL ST
/~
CITY OF OSHKOSH No 123002
BUILDING PERMIT - APPLICATION AND RECORD
Owner WASHINGTON MUTUAL BANK Create Date 12/22/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Canopies
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFRI Demo permit for basement and bathroom walls* The owner will be gutting the walls down to the studs. A building permit shall be
of Work :>btained prior to recovering walls or making structural alterations. The new owner is David Clark.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
CV\
Date 12/22/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1514360000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature 1- y.o~ Date ~ 11..' 1.."1. .~ (,
Agent/Owner
SEATTLE
WA 98101 - 0000 Telephone Number
Address 1201 THIRD AVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.