Loading...
HomeMy WebLinkAbout2006-Plumbing (laterals) e CITY OF OSHKOSH No 121694 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 100 WYLDEWOOD DR Owner MIDWEST GENERAL CONTRACTORS Create Date 09/25/2006 Contractor 4 WAY CONSTRUCTION Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Category 430 - Industrial-Exterior (laterals) Plan Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs 2" water lateral for new 16-unit Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service 2" Plastic Lateral 1 New Parcelld # $3,500.00 $0.00 $50.00 0 Permit Voided I Plan Approval Permit Fees Date 09/25/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easeme t, the City strongly urges the permit applicant to contact the easement holder(s) a d secure any n ss.a~ rovals before starting such activity. Signature f-tfbYJ6 Date Agent/Owner BERLIN WI 54923 - 0133 Telephone Number 920-361-1403 Address P.O. BOX 133 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.