HomeMy WebLinkAbout0122981-Building (sign)
e
OSHKOSH
ON THE WATER
Job Address 265 E SNELL RD
CITY OF OSHKOSH No 122981
BUILDING PERMIT - APPLICATION AND RECORD
Owner RUSCH HOMES LLC Create Date 12/20/2006
Designer
Contractor OWNER
Category
254 - Signs Plan
Type
o Building
. Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq. Ft.
Baths
Signs
Foundation o Poured Concrete 0 Floating Slab o Pier . Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Install 2-4x8 non-ilium wall signs on north face. * Remove the previously installed ground mounted sign. Late Fee assessed, signs
of Work ,installed summer 2006.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$300.00 Plan Approval
~XJ
$0.00 Permit Fee Paid
$125.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
Date 12/20/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1519606710
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any n sary approvals before starting such activity.
Signature
Date
1i).)~7
.
Address
2347 ASHLAND ST
Agent/Owner
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.