Loading...
HomeMy WebLinkAbout0122976-Building (foundation) o OSHKOSH ON THE WATER Job Address 755 W 17TH AVE CITY OF OSHKOSH No 122976 BUILDING PERMIT - APPLICATION AND RECORD Owner DEBRA JANSEN/SHIRLEY A RAKAUSKAS Create Date 12/20/2006 Contractor SURE-DRY-BASEMENT SYSTEMS INC Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Height Ft. D Projection I Unfinished/Basement Sq. Ft. Rooms Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ~FRI Repair the foundation* Along the East side of the house using the grip tite wall anchors. of Work HVAC Contractor Plumbing Contractor Electric Contractor $3,870.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication Fees: Valuation $0.00 Issued By: ~1 Date 12/20/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1405960300 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu!f ~ny necessary approvals before starting such activity. Signature ^,-E~12-- ~~ Date )(JZ/2.LJ;60 Agent/Owner Address 754 W AIRPORT RD MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), YOLir Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.