Loading...
HomeMy WebLinkAbout0122953-Building f' o OSHKOSH ON THE WATER Job Address 1328 CEDAR ST CITY OF OSHKOSH No 122953 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN A LUTZ Create Date 10/13/2006 Contractor JL HOME IMPROVEMENTS INC Designer Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I Bedrooms Stories Canopies - Baths Signs - Zoning Unfinished/Basement Sq. Ft. Finished/Living Sq. Ft. Garage Sq.Ft. Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature of Work FRI Repair fire damage' Most of the work will involve work on the 2nd floor. The stairs to the 2nd floor will be reworked to make them ~ ",~ble, ffipla~ ~e rom aod ,"~eo ~~oo~, HV AC Contractor Plumbing Contractor Electric Contractor ~:~d :uatiO"c\ 1 $12,000,00 Plan Approval $0.00 Permit Fee Paid $100.00 Park Dedication $0.00 Date 12/19/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1203820000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t cure y necessa roy, Is before starting such activity. ~/ )\-) Agent/Owner GRAFTON Date _Y l2-\'1;Db Signature Address WI 53024 - 0000 Telephone Number 414-254-4011 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.