Loading...
HomeMy WebLinkAbout0122965 P o OSHKOSH ON THE WATER Job Address 2496 SECURITY DR CITY OF OSHKOSH No 122965 PLUMBING PERMIT - APPLICATION AND RECORD Owner PHilLIP A1L1NDA S CHARLEY Create Date 12/20/2006 Plan Contractor SAMMONS PLUMBING Category 410 - Residential-Interior Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature SFR /INSTAll GARBAGE DISPOSAL **debtacct of Work Coffee Maker lnt Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Conn. Type Material Type # Sanitary Sewer Storm Sewer Water Service Valuation $300.00 Plan Approval ___~~QQ ISSUedBy~kJ $25.00 0 Permit Voided I Parcel Id # 1622680000 Permit Fees Date 12/20/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s} and to secure any necessary approvals before starting such activity. Signature Address 522 W. MURDOCK AVE AgenUOwner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.