HomeMy WebLinkAbout0122928-Building
e
OSHKOSH
ON THE WATER
Job Address 370 W WAUKAU AVE
CITY OF OSHKOSH No 122928
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH TRUCK CORP Create Date 12/14/2006
Designer
Contractor CR MEYER
Category
211 -Alteration Industrial Plan W8-117-12-6
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Office/Development Center / Interior Alterations - Demo of misc. masonry/metal panel walls for 4 overhead doors, install interior
of Work partitions, modify loading dock, interior foundation and framework for O/H crane.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$206,500.00 Plan Approval
~
$0.00 Permit Fee Paid
$709.00 Park Dedication
$0.00
Issued By:
Date 12/18/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 1413490500
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ap within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure a neces ary approvals before starting such activity.
Signature
Agent/Owner
OSHKOSH
Date iZ{ l'b{ b(?
Address
WI 54902 - 0000 Telephone Number 920-235-3350 x219
To schedule inspections please call the Inspection Request line at 236~5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.