Loading...
HomeMy WebLinkAbout0122928-Building e OSHKOSH ON THE WATER Job Address 370 W WAUKAU AVE CITY OF OSHKOSH No 122928 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH TRUCK CORP Create Date 12/14/2006 Designer Contractor CR MEYER Category 211 -Alteration Industrial Plan W8-117-12-6 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Office/Development Center / Interior Alterations - Demo of misc. masonry/metal panel walls for 4 overhead doors, install interior of Work partitions, modify loading dock, interior foundation and framework for O/H crane. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $206,500.00 Plan Approval ~ $0.00 Permit Fee Paid $709.00 Park Dedication $0.00 Issued By: Date 12/18/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 1413490500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit ap within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure a neces ary approvals before starting such activity. Signature Agent/Owner OSHKOSH Date iZ{ l'b{ b(? Address WI 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236~5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.