Loading...
HomeMy WebLinkAbout0122903-Plumbing e OSHKOSH ON THE WATER Job Address 3530 OMNI DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner OMNI GLASS & PAINT INC Contractor SCOTT DENOBLE & SONS SEWER & WATER INt Category 430 -Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. 3 Trench Drains Fixtures No 122903 Create Date 12/14/2006 Plan W2-226-1206-P Coffee Maker Int Grease Trap 2 Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Exterior storm laterals and area drain for new Omni Glass building. Per plan approval #W2-226-1206-P. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 12" Plastic Lateral 1 New 18" Plastic Lateral 1 New Water Service Parcelld # Use/Nature of Work Valuation Plan Approval $0.00 Permit Fees $135.00 D Permit Voided I Issued By Date 12/14/2006 all work pursuant to rules goveming the described construction. fo easement restrictions of which it is not a party, if you perform the work ent, the City strongly urges the permit applicant to contact the provals before starting such activity. Signature Agent/Owner GREEN BAY WI 54311 - 0000 Telephone Number 920-469-2420,920-4 Address 1910 VERLlN RD Date (J-j/~() To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.