Loading...
HomeMy WebLinkAbout0122485-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 3255 CASEY TRAIL CITY OF OSHKOSH No 122485 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner CHET WESENBERG Create Date 11/10/2006 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor HANNA EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature NSFRI Laterals of Work Valuation Issued By I Size Material Plastic Type Lateral # Conn. Type New Sanitary Sewer 4" Storm Sewer 4" Plastic Main New Water Service 1-1/4" Plastic Lateral New Parcel Id # 1336120000 $2,500.00 $0.00 $150.00 D Permit Voided I Plan Approval Permit Fees Date 11/10/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this ermit application within an easement, the City strongly urges the permit applicant to contact the easement hol r(s and to secure ~e5-~ary approvals before starting such activity. Signature . IC #'~ Agent/Owner Address Date ///t/- c;6 OSHKOSH WI 54904 - 0000 Telephone Number 235-6450 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.