Loading...
HomeMy WebLinkAbout0122612-Plumbing o OSHKOSH ON THE WATER Job Address 3125 BAILEY CT Contractor SBS PLUMBING LLC CITY OF OSHKOSH No 122612 PLUMBING PERMIT - APPLICATION AND RECORD Owner RUSCH HOMES LLC Create Date 09/25/2006 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec 2 Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Bathtub 2 Shower 1 - Whirlpool Floor Drain 1 Lavatory 3 Lndry Tray - Toilet 3 Disposal 1 - Res. Sink 1 Dishwasher 1 - Bar Sink Sump Pump 1 Water Heater Classrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind Misc. 2 Hose Bibs Fixtures Use/Nature of Work Valuation Issued By NSFRI New single family* 1 story with 2 car attached garage and 14' x 14' concrete patio and 2' wide driveway. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1342951200 $6.350.00 Plan Approval a~ $0.00 Permit Fees $140.00 0 Permit Voided I Date 11/20/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH Address PO BOX 3904 WI 54903 - 3904 Telephone Number 920-410-5933 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.