Loading...
HomeMy WebLinkAbout0121627-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 3125 BAILEY CT CITY OF OSHKOSH No 121627 PLUMBING PERMIT - APPLICATION AND RECORD Owner RUSCH HOMES LLC Create Date 09/19/2006 Plan Contractor J & P EXCAVATING Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink DipWelJ F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature NSFR/ water, storm and sanitary laterals. **debit acct of Work Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Conn. Type New Material Plastic # Type Lateral Sanitary Sewer 4" Storm Sewer 4" Plastic Lateral New Water Service 1-1/4" Plastic Lateral New Valuation $1,200.00 $0.00 $150.00 0 Permit Voided I Plan Approval Permit Fees Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 3162 SCENIC DR Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) Parcelld # 1342951200 Date 09/19/2006 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.