Loading...
HomeMy WebLinkAbout2006-Plumbing W2-225-1206-P " ;. City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX "!') , '" ~ OJHKOJH ON THE WATER December 13,2006 Davel Engineering Inc. 1811 Racine Street Menasha, WI 54952 Ref: Plumbing Plan Approval: Wyldewood Development (sewer and water laterals) 150 Wyldewood Dr., Oshkosh, WI Plan 10# W2-225-1206-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and GOMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. All exterior cleanout risers shall comply with COMM 82.35(5) for frost sleeve and cover. Concrete pad is required in areas subject to vehicle traffic. 2. Laterals shall not be extended out of the right-of-way onto private land where a building permit has not been issued for construction of a building structure that would require lateral service to comply with occupancy requirements. MC 20-4 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfully, ... / aA /~/I ~;;;;~~d~ Plumbing Inspector ~ t. '" .. G~ ...t:7.AiU.e:L ~NG December 6, 2006 Richard Wood City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 Re: Wyldewood Village, City of Oshkosh Dear Richard Wood: On behalf of Midwest Real Estate and Development, please find enclosed three sets of plans for the. lateral revisions along Wyldewood Drive, the Plumbing Review Application and the $800.00 review fee check. This application is for building services within the street right-of-way for buildings E, F, K & L. The plans also show revisions for building A-D; however, it is my understanding that Four-Way Construction has already paid for and taken out the permits for these buildings, based on the revised plans. I have enclosed three sets of plans for you to stamp approved. Please return one set to me and forward the remaining two plan sets to. Gerry Frechete at Midwest. If you have any questions or if additional information is required, please let me know. I can be reached at (920) 991-1866. Sincerely, L;ij)~ ]. hn R. Davel, P .E. resident JRD/mas Enclosures (a/s) cc: Ed Potempa, City of Oshkosh (w/outenclosures) Gerry Frechete, Midwest Real Estate & Development {w/out enclosures} 7877 Racine Street. Menasha, W/54952. Ph. 920-997-7866 · Fax 920-830-9595 · www.dave/engineering.com