Loading...
HomeMy WebLinkAbout06-364 DECEMBER 12, 2006 06-364 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO.1 I PUBLIC WORKS CONTRACT 06-06 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FISCHER-ULMAN CONSTRUCTION, INC. 1115 S. Theodore Street Appleton, WI 54915 Net Increase to contract: $67,469.61 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Accl. No. 311-0410-7480-00000 Sidewalk Construction Fund Expenditures Accl. No. 317-0410-7480-03304 Special Assessments-Sidewalks Accl. No. 315-0410-7480-00000 Street Improvement Fund Expenditures Accl. No. 561-2050-6401-00000 Storm Water Utility-Maintenance of Mains TO: Fischer-Ulman ConstruCtion,lnc. 1115 S. Theodore Street Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. and changed as follows: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. 1 Approx.57,500square feet of sidewalk removal & driveway removal, complete as specified, per s uare foot 16,733.70 $5,187.45 2 Approx. 5,500 linear feet of concrete/asphalt sawing, complete as spedfied, per linear foot 148.00 $2.50 $370.00 3 Construct approx. 65,500 square feet of 4" thick concrete sidewalk in . various locations in the City of Oshkosh, complete as specified, per square foot 64,631.80 -868.20 $2.52 ($2.,187.86) 4 Construct approx. 15,000 square feet of6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot -1,706.07 $3.00 ($E;, 118.21) 5 Construct approx. 2,500 square feet of 7" thick crosswalk areas, complete as specified, persquare foot 6,898.71 4,398.71 $3.25 $14,295.81 6 Provide and instalLapprox. 250 square feet of metal detectable warning plates, complete as specified, per s uare foot 262.00 $8,384.00 Approx. 2,000 square feet of three (3") inch asphalt replacement, complete as s ecified, er s uarefoot $787.51 Approx. 300 linear feet of curb and gutter removal, complete as specified, per linear foot $2,642.90 9 Approx. 350 linear feet of 30" curb and gutter, complete as specified, per linear foot $16.80 $10,844.40 Approx~ 1 ,200 square yards of terrace . .... ....... restoration, includihgseed, fertilize, and mulch, complete as specifIed, per s uare ard ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT 11 Furnish and install approx. 50 pavement ties, complete as specified, each 50.00 250.00 200.00 $7.00 $1,400.00 12 Construct approx. 4,000 square feet of 4" thick concrete sidewalk in Water Dept. repair locations at approx. 60 sites, complete as specified, per square foot 4,000.00 2,465.70 -1,534.30 $3.95 ($6,060.49) 13 Construct approx..1 ,000 square feet of 6"fhick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square foot 1,000.00 659.37 -340.63 $4.00 ($1,362.52) 14 Approx.100 square yards of 7" non-reinforced concrete pavement removal and. replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 100.00 135.25 35.25 $38.00 $1,339.50 15 Approx. 1,800 square yards of 8" non-reinforced . concrete pavement removal and replacement, including sawing, pavement ties,integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,800.00 814.65 -985.35 $37.90 ($37,344.77) 16 100.00 107.53 7.53 $323.79 ITEM NUMBER 18 Approx.1 ,200 linear feet of No.4 epoxy-coated reinforcement rods, installed as specified, per linear foot 1,200.00 238.00 19 Furnish, install and maintain Type"C" Inlet protection in approx; 20 locations, complete as s ecified, each 20.00 13.00 Provide $1 ,500 to the City of Oshkosh for project management communications, complete as specified, lump sum -962.00 $1.00 ($962.00) -7.00 $35.00 ($245.00) 8"/7 bag non- reinforced concrete pavement removal and replacement, in91.l~~ingsawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, persquare yard 2 9"/7 bag non- reinforced concrete pavement removal and replacement, including sawing;.. pavement ties,. integral curb & grading, terracing & traffic control, completeas specified, per square yard $42.00 $34,805.40 3 9"/9 bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 31.27 $48.12 613.60 613.60 $2.57 1.00 1.00 1.00 $100.00 7 477.32 $2.05 8 1.00 9 1.00 1.00 $3.32 $12.50 $4.27 $250.00 $1,504.71 $1,576.95 $175.00 $100.00 $978.51 $25.00 $3,030.21 $8,638.64 $268.75 $142.50 $250.00 $5,698.58