HomeMy WebLinkAbout06-364
DECEMBER 12, 2006
06-364
RESOLUTION
(CARRIED 7-0
LOST
LAID OVER
WITHDRAWN
PURPOSE:
CHANGE ORDER NO.1 I PUBLIC WORKS CONTRACT 06-06
INITIATED BY:
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
FISCHER-ULMAN CONSTRUCTION, INC.
1115 S. Theodore Street
Appleton, WI 54915
Net Increase to contract:
$67,469.61
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Accl. No. 311-0410-7480-00000 Sidewalk Construction Fund Expenditures
Accl. No. 317-0410-7480-03304 Special Assessments-Sidewalks
Accl. No. 315-0410-7480-00000 Street Improvement Fund Expenditures
Accl. No. 561-2050-6401-00000 Storm Water Utility-Maintenance of Mains
TO: Fischer-Ulman ConstruCtion,lnc.
1115 S. Theodore Street
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
1 Approx.57,500square feet
of sidewalk removal &
driveway removal,
complete as specified, per
s uare foot 16,733.70 $5,187.45
2 Approx. 5,500 linear feet of
concrete/asphalt sawing,
complete as spedfied, per
linear foot 148.00 $2.50 $370.00
3 Construct approx. 65,500
square feet of 4" thick
concrete sidewalk in .
various locations in the
City of Oshkosh, complete
as specified, per square
foot 64,631.80 -868.20 $2.52 ($2.,187.86)
4 Construct approx. 15,000
square feet of6" thick
concrete sidewalk in
various locations in the
City of Oshkosh, complete
as specified, per square
foot -1,706.07 $3.00 ($E;, 118.21)
5 Construct approx. 2,500
square feet of 7" thick
crosswalk areas, complete
as specified, persquare
foot 6,898.71 4,398.71 $3.25 $14,295.81
6 Provide and instalLapprox.
250 square feet of metal
detectable warning plates,
complete as specified, per
s uare foot 262.00 $8,384.00
Approx. 2,000 square feet
of three (3") inch asphalt
replacement, complete as
s ecified, er s uarefoot $787.51
Approx. 300 linear feet of
curb and gutter removal,
complete as specified, per
linear foot $2,642.90
9 Approx. 350 linear feet of
30" curb and gutter,
complete as specified, per
linear foot $16.80 $10,844.40
Approx~ 1 ,200 square
yards of terrace . .... .......
restoration, includihgseed,
fertilize, and mulch,
complete as specifIed, per
s uare ard
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT
11 Furnish and install approx.
50 pavement ties,
complete as specified,
each 50.00 250.00 200.00 $7.00 $1,400.00
12 Construct approx. 4,000
square feet of 4" thick
concrete sidewalk in Water
Dept. repair locations at
approx. 60 sites, complete
as specified, per square
foot 4,000.00 2,465.70 -1,534.30 $3.95 ($6,060.49)
13 Construct approx..1 ,000
square feet of 6"fhick
concrete sidewalk in Water
Dept. repair locations at
approx. 20 sites, complete
as specified, per square
foot 1,000.00 659.37 -340.63 $4.00 ($1,362.52)
14 Approx.100 square yards
of 7" non-reinforced
concrete pavement
removal and. replacement,
including sawing,
pavement ties, integral
curb & grading, terracing &
traffic control, complete as
specified, per square yard
100.00 135.25 35.25 $38.00 $1,339.50
15 Approx. 1,800 square
yards of 8" non-reinforced
. concrete pavement
removal and replacement,
including sawing,
pavement ties,integral
curb & grading, terracing &
traffic control, complete as
specified, per square yard
1,800.00 814.65 -985.35 $37.90 ($37,344.77)
16
100.00 107.53
7.53
$323.79
ITEM
NUMBER
18 Approx.1 ,200 linear feet of
No.4 epoxy-coated
reinforcement rods,
installed as specified, per
linear foot 1,200.00 238.00
19 Furnish, install and
maintain Type"C" Inlet
protection in approx; 20
locations, complete as
s ecified, each 20.00 13.00
Provide $1 ,500 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
-962.00
$1.00
($962.00)
-7.00
$35.00
($245.00)
8"/7 bag non-
reinforced concrete
pavement removal
and replacement,
in91.l~~ingsawing,
pavement ties, integral
curb & grading,
terracing & traffic
control, complete as
specified, persquare
yard
2 9"/7 bag non-
reinforced concrete
pavement removal
and replacement,
including sawing;..
pavement ties,. integral
curb & grading,
terracing & traffic
control, completeas
specified, per square
yard
$42.00
$34,805.40
3 9"/9 bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties, integral
curb & grading,
terracing & traffic
control, complete as
specified, per square
yard
31.27
$48.12
613.60
613.60
$2.57
1.00
1.00
1.00
$100.00
7
477.32
$2.05
8
1.00
9
1.00
1.00
$3.32
$12.50
$4.27
$250.00
$1,504.71
$1,576.95
$175.00
$100.00
$978.51
$25.00
$3,030.21
$8,638.64
$268.75
$142.50
$250.00
$5,698.58