Loading...
HomeMy WebLinkAbout0121233-Plumbing e CITY OF OSHKOSH No 121233 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 210-240 W MURDOCK AVE Owner BRADLEY OPERATING LIMITED PARTNERSHI Create Date 08/18/2006 Contractor JIM'S PLUMBING & HEATING INC Category 440 - Industrial-Interior Bathtub Shower Water Softner Whirlpool Floor Drain 4 Local Waste Lavatory 2 Lndry Tray Clothes Wshr - Toilet 2 Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 1 2 Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Plan G2-207-0706-P Coffee Maker 3 Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs NEW STRIP MALU INTERIOR PLUMBING FOR NEW STARBUCKS AT 240 W MURDOCK **debit acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # Use/Nature of Work Valuation $4,250.00 Plan Approval $112.00 0 Permit Voided I $0.00 Permit Fees Issued By Date 08/24/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address W6166 GREENVILLE DR Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-5258 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.