Loading...
HomeMy WebLinkAboutPlimbing Plan Approval ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX +i Ie .:1./0 - ;1.<(6 Vv 11/t(v-t4?L ON THE WATER D. R Hansen Plumbing 55 Knapp St. Oshkosh, WI 54952 November 7,2006 Ref: Plumbing Plan Approval: U. S. Cellular (phase II) 230 W. Murdock Ave., Oshkosh, WI Plan ID# W2-222-1106-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. This plan review is for installation of the aboveground only, the riser diagram of the drain & vent system does not reflect the building drain depicted in the floor plan. COMM82.30 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfu IIy, Richard Wood, Plumbing Inspector