Loading...
HomeMy WebLinkAbout0122425-Plumbing e OSHKOSH ON THE WATER Job Address 210-240 W MURDOCK AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 122425 Owner BRADLEY OPERATING L TO PARTNERSHIP Contractor D.R. HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain 1 Lndry Tray 1 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Gri nd Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Create Date 11/01/2006 Category 440 - Industrial-Interior Plan W2-222-1106-P Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i 30 W Murdock /Interior alterations to complete this space for US Cellular. """DEBIT ACCOUNT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1518981100 Valuation Issued By $6,500.00 5r-nw Plan Approval ~_~lO.OO Permit Fees $25.00 D Permit Voided I Date 11/06/2006 In the perfonmance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.