HomeMy WebLinkAbout0122829-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 216 W 19TH AVE
CITY OF OSHKOSH No 122829
BUILDING PERMIT - APPLICATION AND RECORD
Owner TODD G HOLZHAUSEN Create Date 12/08/2006
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature ~FRllnstalling siding on the east side of the house. *This work is to be completed no later than 6/1/07. An extension was granted due to
of Work he relocation of the electrical service to underground. The boring will be done as soon as the frost is out of the ground.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: valuo
Issued By: I~
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Date 12/08/2006
Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 1404880000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and toc~" any necessa a pr vals before starting such activity.
Signature c:::J....J.J) C Date ~ 1-- Z ~ 0 {,
Agent/Owner
Address 216 W 19TH AVE
OSHKOSH
WI 54902 - 6928 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.