Loading...
HomeMy WebLinkAbout0122829-Building (siding) e OSHKOSH ON THE WATER Job Address 216 W 19TH AVE CITY OF OSHKOSH No 122829 BUILDING PERMIT - APPLICATION AND RECORD Owner TODD G HOLZHAUSEN Create Date 12/08/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FRllnstalling siding on the east side of the house. *This work is to be completed no later than 6/1/07. An extension was granted due to of Work he relocation of the electrical service to underground. The boring will be done as soon as the frost is out of the ground. HV AC Contractor Plumbing Contractor Electric Contractor Fees: valuo Issued By: I~ $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 12/08/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 1404880000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and toc~" any necessa a pr vals before starting such activity. Signature c:::J....J.J) C Date ~ 1-- Z ~ 0 {, Agent/Owner Address 216 W 19TH AVE OSHKOSH WI 54902 - 6928 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.