Loading...
HomeMy WebLinkAbout0122845-Building (interior demo) e OSHKOSH ON THE WATER Job Address 250 CITY CENTER CITY OF OSHKOSH No 122845 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY CENTER ASSOCIATES LLC Create Date 12/11/2006 Designer Contractor OWNER Category 223 - Alteration Offices, Banks, Professional Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature Office / Misc Demolition of suites 271, 278,284,290,296,300,320,324 in preparation to remodel for expansion of the Miles Kimball Suite. of Work (Approx. 21,211 sf.) HV AC Contractor Plumbing Contractor Electric Contra'ctor Issued By: Date 12/11/2006 Final/O.P. 00/00/0000 Fees: Valuatio $42,000.00 Plan Approval $0.00 Permit Fee Paid $214.00 Park Dedication $0.00 D Permit Voided J Parcelld # 0100600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure an ore starting such activity. Signature Date I;z.~/ ~ b I / Address 2347 ASHLAND ST WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.