Loading...
HomeMy WebLinkAbout2006-Building (raze) e OSHKOSH ON THE WATER Job Address 1101 S MAIN ST CITY OF OSHKOSH No 122901 BUILDING PERMIT - APPLICATION AND RECORD Owner GERALD KRUEGER Create Date 12/08/2006 Designer Contractor FOUST EXCAVATING Category 285 - Wrecking (Industrial & Commercial Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: 5Bibc Size Unfinished/Basement Sq. Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection I Canopies Finished/Living Bedrooms Stories 2 Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures Park Dedication Use/Nature Raze and Remove 2 story Commercial/Residential Use Building. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,425.00 Plan Approval Issued By: ~"'Jj' $0.00 Permit Fee Paid $81.00 Park Dedication $0.00 Date 12/14/2006 Final/O.P. 00/00/0000 o Permit Voided I ___._____J Parcelld # 0303100000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions ofwhich it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure >>J/~IS before starting such activity. I <J /. Signature ,--- ~1'~ Date <::/7/~(t Agent/Owner Address 2824 CLAIRVILLE RD OSHKOSH WI 54904 - 0000 Telephone Number 426-5808 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building jf Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.