Loading...
HomeMy WebLinkAbout0122898-Building e OSHKOSH ON THE WATER Job Address 13 E CUSTER AVE CITY OF OSHKOSH No 122898 BUILDING PERMIT - APPLICATION AND RECORD Owner DEBORA M RESOP Create Date 12/08/2006 Designer Contractor FOUST EXCAVATING Category 285 - Wrecking (Industrial & Commercial Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: 3Bibc Size Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Canopies Finished/Living Bedrooms Stories 2 Garage Sq.Ft. Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood . Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature Raze and Remove 2 story masonry commerciallindustrial use building. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,595.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Issued By: ~ Date 12/14/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1504990000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y. rovals before starting such activity. Signature Date \( /,.r.h Y;;(yt(; Address 2824 CLAIRVILLE RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 426-5808 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.