Loading...
HomeMy WebLinkAbout0122804-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 1526 INDIGO DR Contractor BERNDT EXCAVATING CITY OF OSHKOSH No 122804 PLUMBING PERMIT - APPLICATION AND RECORD Owner PHUNG HUYNH/BACH NGUYEN Create Date 12/06/2006 Plan Category 430 - Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature REPAIR 6" PRIVATE MAIN. of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service 6" Iron Main Repair Valuation . $1 ,500~ \ Plan Approval Issued By ~lA..J $0.00 $50.00 0 Permit Voided I Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work desyribed in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hold () and to ecure ~( ec sary appr.tarting such activity. Signature IJ( Address 2527 W WAUKAU AVE Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 235-3331 Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcel Id # 1307310100 Date 12/06/2006 Date IJ..--(Pr-OC, To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.