Loading...
HomeMy WebLinkAbout0120914-Plumbing e OSHKOSH ON THE WATER Job Address 711 BAY SHORE DR CITY OF OSHKOSH No 120914 PLUMBING PERMIT - APPLICATION AND RECORD Contractor O'NEILL ENTERPRISES INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature CBRF/ Addition to CBRF Interior plumbing. "debit acct of Work Shower Floor Drain 19 Lndry Tray 18 Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Gri nd 3 Hose Bibs 17 2 1 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner HEALTH CARE REIT INC Create Date 07/21/2006 Category 440 - Industrial-Interior Plan G2-200-0606-P Wait. St. Ice Chest 3 Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn 3 Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Sanitary Sewer Size 4" Storm Sewer Water Service 2" Material Plastic Plastic Type Lateral # Conn. Type Relay $100,000.00 Parcelld # 0805860100 $0.00 Plan Approval Permit Fees Lateral Relay Date 08/03/2006 $490.00 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W 6TH AVE Agent/Owner OSHKOSH Date WI 54902 - 0000 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.