Loading...
HomeMy WebLinkAboutFOOTING FOUNDATION PLAN APPROVAL .... j commerce.wi.gov ~~9Jl~ln Safety and Buildings 2331 SAN LUIS PL STE 150 GREEN SAY WI 54304 TOD #: (608) 264-8777 www.commerce.wi.gov/sb/ www.wisconsin.gov SBP rID 6 2@@S Jim Doyle, Governor Mary P. Burke, Secretary '!!'C" ".~")i D"~D~v:;rri),I,'i'""rl>i,~'~~,AI",',' ,cf'&!, of' .c~ irt:t.d!l!,~jg;t:J;~ ~ t~t CG r1i~ ~vsu~~~i JiJ' ,i.tbW5tfL,~PlI~li~'r September 01, 2005 CUST ID No. 271821 AITN: Buildings & Structures Inspector THOMAS R KARRELS 1934 ALGOMA BOULEVARD OSHKOSH WI 54901-2104 BUILDING INSPECTION CITY OF OSHKOSH POB 1130 OSHKOSH, WI 54902 SITE: Jay Manufacturing 2045 W 20TH St City of Oshkosh, 54901 FOR: Object Type: Building ICC Regulated Object ID No.: 1032698 Major Occupancy: Factory; Type IIB Metal Frame Unprotected class of construction; Addition-Alteration plan; 15,100 project sq ft; Occupancy: F-2 Factory Low-Hazard FOOTING FOUNDA TION APPROVAL PLAN APPROVAL EXPIRES: 09/01/2000 The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED to allow construction of the Footings and Foundations only, for the subject project prior to review and approval of the full building plans by this department. The owner, as defined in s. 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. Prior to the start of construction, all applicable building permits should be obtained from the local authorities having jurisdiction in accordance with local laws and ordinances. Nothing in this approval limits the power of municipalities to make, or enforce, additional or more stringent regulations, providing the regulations do not conflict with this code or any other rule of the department, or law. DEPARTMENT CONDITIONS . If this project is in an unsewered area, a sanitary permit must be obtained prior to the issuance of a local building permit. . This approval is only for footing and foundation work. Construction of the remainder of the building shall not take place prior to departmental review and conditional approval of the construction plans. . If this construction project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOI) shall be filed with the department. . This "Permission to Start" does not include permission to install any underground plumbing, including sanitary/storm sewers, or water or mains. All projects needing submittal per Comm Tables 82.20-1&2 must have complete plumbing plans, application, & fees submitted and approved prior to commencement of any plumbing work. A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. All permits required by the state or the local municipality shall be obtained prior to commencement of construction/installation/operation. THOMAS R KARRELS Page 2 9/112005 In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per s. 101.12(2), Wisconsin Statutes, nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. )nquiri€s concerning this correspondence may be made to me atthe telephone number listed below, or at the address on this letterhead. Please refer to Transaction ID No. referred to in the regarding line when making an inquiry or submitting additional information. SinCeel~ ~tO Fee Required $ Fee Received $ Balance Due $ L nne MLeCount , Engineering Consultant Integrated Services Fire Protection and Commercial (920)492-7727 , MTRF 7 am - 4:30 pm, W 7 am - 11 am llecOlint@commerce.state.wi.us 300.00 300.00 0.00 cc: Fox Cities Construction Corp Peter R Ochs, Building Inspector, (920) 948-3500 , Friday, 7:45 A.M. - 4:30 P.M.