HomeMy WebLinkAbout0120855-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 1519 N MAIN ST
CITY OF OSHKOSH No 120855
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL MILISA A1MARY E ALBERS Create Date 07/31/2006
Contractor THO AT-HOME SERVICES INC
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq. Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Signs
Finished/Living
Bedrooms
Stories
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature FR / REPLACE 22 WINDOWS, SAME SIZE AND LOCATION, NO STRUCTURAL CHANGES
of Work
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation $13,348.00 Plan Approval
Issued By: S~ t.t)
$0.00 Permit Fee Paid
$112.00 Park Dedication
$0.00
Date 08/01/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1501350000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
AgenUOwner
3200 COBS GALLERIA PKWY STE 200 ATLANTA
GA 30339 - 0000
Telephone Number
630-832-4049
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.