HomeMy WebLinkAbout0120869-Plumbing (interior)
e
OSHKOSH
ON THE WATER
Job Address 3072 LAKE REST LN
CITY OF OSHKOSH
No
120869
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DAVID C & JOAN M RITMANICH Create Date 08/01/2006
Category 410 - Residential-I nterior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec 2 Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor SBS PLUMBING LLC
Bathtub 2 Shower
Whirlpool Floor Drain 2
-
Lavatory 2 Lndry Tray 1
-
Toilet 2 Disposal
-
Res. Sink 1 Dishwasher 1
-
Bar Sink Sump Pump 1
Water Heater Classrm Sink
Site Drain Breakrm Sink
Roof Drain Ejector/Gri nd
Misc. 2 OUTSIDE SILCOCKS
Fixtures
Use/Nature
of Work
NSFRlINTERIOR PLUMBING, POWER VENT WATER HEATER. **DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1415700000
$126.00 0 Permit Voided I
$6,840.00
Plan Approval
$0.00 Permit Fees
Valuation
Issued By
Date 08/01/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 3904
Agent/Owner
OSHKOSH
WI 54903 - 3904 Telephone Number 920-410-5933
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.