Loading...
HomeMy WebLinkAbout0120849-Plumbing (water softener) e OSHKOSH ON THE WATER Job Address 2134 FAIRVIEW ST CITY OF OSHKOSH No 120849 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner MELVIN G/AMY S APELL Create Date 08/01/2006 Category 410 - Residential-I nterior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor CULLIGAN WATER CONDITIONING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install water softener of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1514813800 $350.00 Plan Approval W.J $0.00 $25.00 D Permit Voided I Permit Fees Date 08/01/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 405 PROSPECT AVE Agent/Owner N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.