Loading...
HomeMy WebLinkAbout0120839-Plumbing (interior) o CITY OF OSHKOSH No 120839 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1451 WELLINGTON CT Owner PHILIP H/L1SA M LEVINE Create Date 06/27/2006 Contractor TUREKS PLUMBING INC 1 1 1 1 1 1 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Category 410 - Residential-Interior Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature NSFRI New single family home **check #1505 & check #1506 of Work 2 Shower Floor Drain 4 Lndry Tray 4 Disposal 1 Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 2 silcocks Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Sanitary Sewer Size Storm Sewer Water Service Material Type # Conn. Type Parcelld # 1342770000 Valuation $15,000.00 Plan Approval Issued By s.tY'\l.t) -- $0.00 Permit Fees $161.00 0 Pe:~itVoid~ Date 07/31/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N2808 MEADE ST APPLETON WI 54913 - 0000 Telephone Number 920-731-0462 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.