Loading...
HomeMy WebLinkAbout0120835 P e OSHKOSH ON THE WATER Job Address 2640 WISCONSIN ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner GERALD J/DIANE L PANOCH Contractor HANSON QUALITY PLUMBING Category 410 - Residential-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work 1 Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink 1 Lndry Tray Clothes Wshr Exam Sink Catch Basin - 1 Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp No 120835 Create Date 07/31/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs SFR /INSTALL TUB, LAV, TOILET AND BAR SINK, FOR BASEMENT REMODEL *DEBT ACCT ... Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1219740402 Valuation $0.00 Permit Fees __ $28.00 D Permit Voided I Plan Approval Issued By Date 07/31/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 550 N BLUEMOUND RD Agent/Owner APPLETON WI 54914 - gooo Telephone Number 730-0205 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.