HomeMy WebLinkAbout0120835 P
e
OSHKOSH
ON THE WATER
Job Address 2640 WISCONSIN ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner GERALD J/DIANE L PANOCH
Contractor HANSON QUALITY PLUMBING
Category 410 - Residential-Interior
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
1 Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
1 Lndry Tray Clothes Wshr Exam Sink Catch Basin
-
1 Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
No 120835
Create Date 07/31/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
SFR /INSTALL TUB, LAV, TOILET AND BAR SINK, FOR BASEMENT REMODEL *DEBT ACCT ...
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1219740402
Valuation
$0.00 Permit Fees
__ $28.00 D Permit Voided I
Plan Approval
Issued By
Date 07/31/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 550 N BLUEMOUND RD
Agent/Owner
APPLETON
WI 54914 - gooo Telephone Number 730-0205
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.