Loading...
HomeMy WebLinkAbout0120823-Plumbing (water softener) e OSHKOSH ON THE WATER Job Address 80 90 CHERRY PARK CT CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Category 410 - Residential-Interior Owner MOKLER CONSTRUCTION LLC No 120823 Create Date 07/31/2006 Contractor CULLIGAN WATER CONDITIONING Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Use/Nature #80 - install water softener of Work Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type Valuation $350.00 Plan Approval 024-/ Parcelld # 1416760200 $0.00 Permit Fees Issued By $25.00 D Permit Voided I Date 07/31/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 405 PROSPECT AVE Agent/Owner N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.