Loading...
HomeMy WebLinkAbout0120765-Plumbing e OSHKOSH ON THE WATER Job Address 240 OHIO ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner BROS LLC Contractor WATTERS PLUMBING Category 430 -Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature Install sewer and water laterals of Work No 120765 Create Date 07/24/2006 Plan G2-205-0706-P Coffee Maker lnt Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Con':!. Type New Material Plastic Type Lateral # Sanitary Sewer 4" Storm Sewer Water Service 1" Copper Lateral New Parcelld # 9060021600 Valuation $1,200.00 Plan Approval ___ $0.00 Permit Fees $100.00 D Permit Voided I Issued By 8-Yr-, Lu Date 07/27/2006 _.._"._~ In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 118 MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.