Loading...
HomeMy WebLinkAbout0120767-Plumbing (interior) o OSHKOSH ON THE WATER Job Address 1235 MOUNT VERNON ST Contractor OWNER Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By CITY OF OSHKOSH No 120767 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner RYAN R PEISSIG/LAURA M BAENEN Create Date 07/25/2006 Category 410 - Residential-I nterior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp House was put on a new foundation. New underground building drain to be installed by homeowner. Home is occupied. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1506710000 $500.00 $0.00 $35.00 0 Permit Voided I Plan Approval Permit Fees Date 07/27/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) to seClJfe any ~ approvals before starting such activity. Signature y~' Date 7- 2, 7 ~u{ AgenUOwner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.