Loading...
HomeMy WebLinkAbout0120785-Plumbing (water softener) o OSHKOSH ON THE WATER Job Address 1842 MICHIGAN ST CITY OF OSHKOSH No 120785 PLUMBING PERMIT - APPLICATION AND RECORD Contractor CULLIGAN WATER CONDITIONING Category 410 - Residential-I nterior Owner HOWARD J/SUE A GINTNER Create Date 07/27/2006 Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Gri nd Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install water softener. Home was recently purchased by Richard Geffers. of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Size Material Type # Conn. Type $330.00 $0.00 Permit Fees Parcelld # 1405720000 Plan Approval Sanitary Sewer Storm Sewer Water Service $25.00 0 Permit Voided I [Ul/ Date 07/27/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 405 PROSPECT AVE Agent/Owner N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue ifthe inspection is not performed within two business days from the time the project is ready.