Loading...
HomeMy WebLinkAbout0120801 P o CITY OF OSHKOSH No 120801 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1810 MENOMINEE DR Owner CHARLES R BEHNKE TRUST Create Date 07/27/2006 Category 410 - Residential-Interior Contractor RAPID SOFT LLC Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Replace dishwasher. Owner to contact electrician. Bad wires. Do not hook up. of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type $616.00 Plan Approval CJ4/ $0.00 Permit Fees Parcel Id # 1512820000 $25.00 D Permit Voided I Date 07/27/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N1284 CRANDON CT GREENVILLE WI 54942 - 0000 Telephone Number 757-6130 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.