Loading...
HomeMy WebLinkAbout120768 B e OSHKOSH ON THE WATER Job Address 856 W 18TH AVE CITY OF OSHKOSH No 120768 BUILDING PERMIT - APPLICATION AND RECORD Owner URBAN J BLANK Create Date 07/27/2006 Designer Contractor PACKER VALLEY BUILDERS, INC Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Repairing vehicle damage> to the front of the house including replacing several studs, a window, insulation, drywall siding/ stone of Work ~en~er. , HVAC Contractor Plumbing Contractor Electric Contractor BEEZ ELECTRIC INC Fees: Valuation $13,000.00 Plan Approval ~7J $0.00 Permit Fee Paid $106.00 Park Dedication $0.00 Issued By: Date 07/27/2006 Final/D.P. 00/00/0000 o Permit Voided I Parcelld # 1410090101 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and ,to secure ~~)llessary alWfovals befbre starting such activity. Signature X ':~::/.A- y ~ Date X 1/2. 7/o(P , /~' v t Agent/Owner Address 2277 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920-232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.