Loading...
HomeMy WebLinkAbout0120774 P G OSHKOSH ON THE WATER Job Address 683 JEFFERSON ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120774 Owner CITY OF OSHKOSH REDEVELOPMENT AUTHC Create Date 06/23/2006 Plan Contractor CITY OF OSHKOSH Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp . Misc. Fixtures Use/Nature abandon water and sewer laterals of Work Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Type # Conn. Type Material Sanitary Sewer Storm Sewer Water Service Valuation _~OO.OO Plan Approval ___ $0.00 Permit Fees Issued By $0.00 D Permit Voided I Parcelld # 0402370000 Date 07/27/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 215 CHURCH AVE -. ,-- --- OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.),Acc~ss into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.