Loading...
HomeMy WebLinkAbout0120729-Building (windows) e OSHKOSH ON THE WATER Job Address 1705 OREGON ST CITY OF OSHKOSH No 120729 BUILDING PERMIT - APPLICATION AND RECORD Owner WAYNE W/BRENDA J SOBIESCZYK Create Date 07/25/2006 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Canopies Finished/Living Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature ~FR /INSTALL 5 VINYL REPLACEMENT WINDOWS (SAME SIZE & LOCATION), NO STRUCTURAL CHANGES of Work Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation $1,050.00 Plan Approval Issued By: Smw $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 07/25/2006 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1403600000 I In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 235 MORRIS ST Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.