Loading...
HomeMy WebLinkAbout0120735-Building o OSHKOSH ON THE WATER Job Address 2201 JACKSON ST CITY OF OSHKOSH No 120735 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS RUSCH Create Date 07/24/2006 Designer Chet Wesenberg Contractor RUSCH CONSTRUCTION LLC Category 221 - New Offices, Banks, Professional Plan U3-68-0706 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement 3087 Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Office/ Foundation only - for new 3087 sq ft office building as per plans. of Work HV AC Contractor Plumbing Contractor Electric Contractor 00.00 Plan Approval $0.00 Permit Fee Paid $81.00 Park Dedication $0.00 Issued By: Date 07/25/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permi application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se e a y n e sary rovals before starting such activity. Signature AgenUOwner Oshkosh Da~ 7-~b Address 3807 A STATE HWY 21 WI 54904 - 9323 Telephone Number 231-8203 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.