Loading...
HomeMy WebLinkAboutREQUEST FOR ADDITIONAL INFORMATION ~ OJHKOJH City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 www.ci.oshkosh.wi.us ON THE WATER July 25, 2006 Keith Paul GMS Inc. 520 W South Park Ave. Oshkosh, WI 54901 Kevin Uhen City of Oshkosh Safety Coordinator 215 Church Ave. Oshkosh, WI 54903 REQUEST FOR ADDITIONAL INFORMATION Site: Plan Number: U5-74-0706 City of Oshkosh Safety Building 420 Jackson St. Oshkosh WI 54903 For: Description: HV AC - Fume Hood Object Type: HV AC only Class of Construction: lIB - 500 Sq Ft.; Unsprinklered Occupancy: B: Business I Office The submittal described above has been placed on HOLD and the review and approval is pending subject receipt of the ADDITIONAL INFORMATION and lor revised plans the plans will be reviewed for compliance to applicable Wisconsin Administrative Codes and Wisconsin Statutes. Please provide information addressing the following issues: · Plans submittal is required to include a complete list of all chemicals / materials that will be used in the proposed fume hood. While we have been provided with copies of the MSDS sheets prior to the plans being submitted, plan documents need to include a listing of all chemicals / materials that will be used in the proposed fume hood. Plans will be reviewed and code compliance determined and conditioned on the use of the fume hood being limited to the list of chemicals / materials submitted in the plan submittal. · If the fume hood system being installed is not going to be installed to meet the requirements ofIMC Section 510, provide documentation that the conditions listed in section 510.2 will not exist in the absence of the proposed exhaust system. Provide plans / specifications thill comply with all of the requirements of Section 510 or provide documentation that shows the conditions listed in Section 510.2 will not exist in the absence of the exhaust system. · Make-up air shall be provided at a rate approximately equal to the rate that air is exhausted. Provide additional details / information on how make-up air will be provided Based on the information provided to date it would appear that 1160 cfm of make-up air is required. GeAr S!.r~rnp\420 Jackson withheld leller.Jue Page I of2 · Fans shall be selected to meet requirements for fire, explosion, and corrosion. Provide information detailing how this has been complied with. · Air exhausted from laboratory hoods and special exhaust systems shall be discharged above the roof. Provide additional details, drawings showing where the exhaust duct will be discharged, as well as how the ductwork enclosure will be constructed, including access panel size and locations. · Comm 10, Flammable and combustible Liquids, adopts NFP A 45 - Standard on Fire Protection for Laboratories Using Chemicals. This standard includes a section covering Laboratory Ventilating Systems and Hood Requirements, that applies to this installation. Provide plans/ specifications that show compliance with NFP A 45 requirements. The check that was included with this submittal, check number 35280 for $230.00, is being returned, as this is a City project, and permit fees, and review fees are waived for City owned projects. If you have any questions after reading the above comments, please call me at the telephone number below. If the above requested information and/or plans are not received within 30 business days of the date of this correspondence, this submittal will be returned denied. No fees will be refunded, and a new fee, application for, and submittal of plans / specifications will be required should you desire to continue with this project. The code in effect at the time of new submittal would apply. Resp~ ~ Building Systems Consultant (920) 236-5051 Monday - Friday 7:30 AM. to 8:30 AM and 12:30 AM to 1:30 P.M. bnoe@ci.oshkosh.wi.us cc: Property fIle Fee Required $ Fee Received $ Balance Due $ 0.00 230.00 0.00 C"DOCUME-. l\briann\LOCAI.:'>i '..r~m[.l'A10 Jackson withheld leueLdoc Page 2 of2