HomeMy WebLinkAbout06-238 JULY 25, 2006 06-238 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE:CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 05-14 INITIATED BY:DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FOUR-WAY CONSTRUCTION OF WI INC. PO Box 133 Berlin, WI 54923 Net Increase to contract: $33,711.59 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 – Sewer Utility – Constr. in Progress Acct. No. 561-2010-1799-00000 – Storm Water Utility – Constr. in Progress CHANGE ORDER # 1 DATED: July 14, 2006 TO: Four-Way Construction of WI Inc. P. O. Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 05-14 , is hereby amended NET INCREASE TO: SECTION 1- SANITARY SEWER NET DECREASE TO: SECTION 11- WATER MAIN NET INCREASE TO: SECTION III - STORM SEWER $16,623.44 ($234.44) $17,322.59 NET INCREASE TO CONTRACT: $33,711.59 CITY OF OSHKOSH BY: Recommended: b~vdC.~ Director of Public Works City Manager City Clerk Approved and accep-ted: O~ I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 05-14 CHANGE ORDER # 1 SECTION I - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1. Furnish and install approx. 500 linear feet of 10" Sanitary Sewer with Natural Backfill, complete as specified, per linear foot 500.00 500.00 $24.05 2. Furnish and install approx. 870 linear feet of 10" Sanitary Sewer with Gravel Backfill, complete as specified, per linear foot 870.00 871.79 1.79 $40.50 $72.49 3. . Furnish and install approx. 72.5 vertical feet of std. Sanitary Manhole (4' Inside Diameter), complete as specified, in six (6) locations with castings, per vertical foot 72.50 72.50 $150.00 4. Extend and connect 6" Sanitary Lateral on W. Waukau Avenue, complete as specified, lump sum 1.00 1.00 $850.00 5. Remove and replace approx. 70 square yards of 8" non-reinforced concrete pavement, including curb, complete as specified, per square yard 70.00 157.81 87.81 $45.00 $3,951.45 6. Remove approx. 125 cubic yards of rock, per square lyard 125.00 203.70 78.70 $55.00 $4,328.50 7. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION 1- (BID ITEMS 1 -7) - SUB-TOTALS $8,352.44 $0.00 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I Page 1 CONTRACT: 05-14 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANT/TIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Rock removed along W. Waukau Avenue, per cubic yard 36.20 36.20 $205.00 $7,421.00 2 Reconstruct approx. one (1) Sanitary Manhole (Recreation Gym Parking Lot) complete as specified, each. 1.00 1.00 $850.00 $850.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 - 2) - SUB-TOTAL NET INCREASE TO SECTION I - $8,271.00 $16,623.44 $0.00 SECTION 11- WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 8. Furnish and install approx. 805 linear feet of 8" Ductile Iron Water Main w/polywrap (Fernau Court easement), complete as specified (fittings not included), per linear foot 805.00 810.50 5.50 $34.75 $191.13 9. Furnish and install approx. 215 linear feet of 8" Ductile Iron Water Main (Wilson Avenue) w/polywrap, complete as specified, (fittings not included), per linear foot 215.00 216.00 1.00 $50.95 $50.95 10. Furnish and install approx. one (1), 6" x 6" Tee, complete as specified, each 1.00 1.00 $305.00 11. Furnish and install approx. four (4), 8" - 45 degree Bends, complete as specified, each 4.00 4.00 $225.00 Page 2 CONTRACT: 05-14 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 12. Furnish and install approx. one (1), 8"-221/2 degree Bend, complete as specified, each 1.00 1.00 $225.00 13. Furnish and install approx. one (1), 8" x 6" Reducer, complete as specified, each 1.00 1.00 $150.00 14. Furnish and install approx. one (1) 6" Cut-In Valve, complete as specified, each 1.00 0.00 -1.00 $1,155.00 ($1,155.00) 15. Furnish and install approx. one (1) 12" x 8" Tapping Valve and Sleeve, complete as specified, each 1.00 1.00 $1,760.00 16. Remove and re-install Guardrail on Wilson Avenue, complete as specified, lump sum 1.00 1.00 $200.00 17. Clear and grub existing trees, fence and shrubs on Wilson Avenue, complete as specified, lump sum 1.00 1.00 $1,350.00 18. Remove and replace approx. 15 square yards of 5" asphalt pavement on Vinland Road, complete as specified, per square yard 15.00 15.42 0.42 $44.00 $18.48 19. Provide $375.00 to the. City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION II - (BID ITEMS 8 -19) - SUB-TOTALS $260.56 ($1,155.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 lOne (1) 6" valve 1.00 1.00 $660.00 I $660.00 I ADDITIONAL WORK: C.O. # 1 - (ITEM 1). SUB.TOTAL $660.00 $0.00 Page 3 CONTRACT: 05-14 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE NET DECREASE TO SECTION II - ($234.44) SECTION III . STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 20. Provide and install 6" Storm Lateral for 1230 Heritage Trail, complete as specified, lump sum 1.00 1.00 $4,185.00 21. Provide and install 6" Storm Lateral for 1260 Heritage Trail, complete as specified, lump sum 1.00 1.00 $3,990.00 22. Provide and install 6" Storm Lateral for 1125 Hazel Street, complete as specified, lump sum 1.00 1.00 $5,615.00 23. Provide and install 6" Mini- Storm Sewer on Minerva Street, complete as soecified, lump sum 1.00 1.00 . $4,255.00 24. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION III - (BID ITEMS 20 - 24 ) - SUB-TOTALS $0.00 $0.00 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III - RECREATION GYM PARKING LOT - STORM SEWER WORK ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Furnish and install approx. one (1) Std. Type 3 Inlet w/18" sump, wlo casting, complete as specified, each. 1.00 1.00 $1,250.00 $1,250.00 Page 4 CONTRACT: 05-14 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Furnish and install approx. two (2) Std. Type 1 Inlet w/18" sump, wlo casting, complete as specified, each. 2.00 2.00 $625.00 $1,250.00 3 Furnish and install approx. 7.91 vertical feet of Std. Storm Manhole (4' inside diameter) in two (2) locations, wlo castings, complete as specified, per vertical foot. 7.91 7.91 $335.00 $2,649.85 4 Furnish and install approx. 288.9 linear feet of 12" Storm Sewer, complete as specified, per linear foot. 288.90 288.90 $35.75 $10,328.18 5 Furnish and install approx. 38 linear feet of 15" Storm Sewer, complete as specified, per linear foot 38.00 38.00 $34.75 $1,320.50 6 Abandon approx. one (1) Inlet, complete as scecified, each 1.00 1.00 $250.00 $250.00 7 Investigate and backfill sinkhole, lump sum 1.00 1.00 $274.06 $274.06 ADDITIONAL WORK: c. O. # 1 . (ITEMS 1 -7). SUB.TOTAL $17,322.59 $0.00 NET INCREASE TO SECTION III . $17,322.59 NET INCREASE TO SECTIONS I, II, III NET DECREASE TO SECTIONS I, II, III $34,866.59 ($1,155.00) NET INCREASE TO CONTRACT: $33,711.59 Page 5