Loading...
HomeMy WebLinkAbout0120683 P G CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 438 N WESTFIELD ST No 120683 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner OSH AREA SCHL DIST WEST HIGH Create Date 0711 0/2006 Category 430 - Industrial-Exterior (laterals) Plan FL-203-0706-P Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor BERNDT EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation SANITARY AND WATER LATERALS FOR NEW CONCESSION STAND Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service 1-1/2" Plastic Lateral 1 New Parcel Id # 1608720100 $6,000.00 $0.00 $100.00 D Permit Voided I Plan Approval Permit Fees Issued By Date 07/24/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit t to contact the easement holder nd to sec an nec~ry appr als before sta ity. Signature pC c:: Date 7....... 1- if -6 Agent/Owner Address 2527 W WAUKAU AVE OSHKOSH WI 54904 - 0000 Telephone Number 235-3331 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.