HomeMy WebLinkAbout0120688-HVAC
e
OSHKOSH
ON THE WATER
Job Address 1943 MICHIGAN ST
CITY OF OSHKOSH
No
120688
HV AC PERMIT - APPLICATION AND RECORD
Owner ROBERT S/STACEY E REESE
Create Date 07111/2006
Contractor ANDRESEN SHEET METAL
Fuel U Gas UOil
System D New
U Forced Air U Radiant
U Electric U Hot Water
Chimney Type U Chimney A () Chimney B
Heat Loss () As Approved () Existing
BTU Rate () As Per Plan () Variable
Category 500 - Residential-Heating & Ventilating Plan
U Electric
D Replace
U Steam
U Suppl.
() Direct Vent
U Solar U Solid
D Other
U NC U Vent
U Con. Burner
. Not Applicable
. Not Applicable
. Other
Value
Value
Use/Nature ~FRI Removing a portion of the wall between the kitchen and dining room to open up the kitchen. A code compliant header will be installed
of Work in addition to a footing and post in the basement. A pantry will also be constructed in the kitchen. No cabinets.Move ductwork for
remodeling
Fees: Valuation
$1,000.00
~
Plan Approval
$0.00
Permit Fee Paid
$25.00
Issued By:
Date 07/24/2006
D Permit Voided I
Parcelld # 1409610100
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
2913 WITZEL AVE
OSHKOSH
WI 54904 - 6539 Telephone Number (920) 233-0323
.
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.