Loading...
HomeMy WebLinkAbout0120692-Building (windows) G OSHKOSH ON THE WATER Job Address 1813 HUBBARD ST CITY OF OSHKOSH No 120692 BUILDING PERMIT - APPLICATION AND RECORD Owner KENNETH K1KAREN KUSSMANN Create Date 07/21/2006 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY C( Category 141 - Exterior Remodeling Plan . Building o Sign o Canopy o Fence o Raze Type Zoning Class of Const: Size U nfi nished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Replace 6 windows in existing openings and wrap exterior with aluminum trim of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,283.00 Plan Approval OA/ $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: Date 07/24/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1407910000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN DR AgenUOwner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.