HomeMy WebLinkAbout0120685-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 3180 ELK RIDGE DR
PLUMBING PERMIT - APPLICATION AND RECORD
CITY OF OSHKOSH No 120685
Owner MIDWEST GENERAL CONTRACTORS INC Create Date 06/23/2006
Plan
Contractor WATTERS PLUMBING
Category 410 - Residential-Interior
Bathtub 6 Shower 6 Water Softner Wait. St. Shamp Sink
-
Whirlpool Floor Drain 6 Local Waste Ice Chest FlrlWst Sink
Lavatory 12 Lndry Tray Clothes Wshr 6 Exam Sink Catch Basin
-
Toilet 12 Disposal 6 Bidet Sculry Sink Wash Ftn
- -
Res. Sink 6 Dishwasher 6 Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater 6 Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc. Hose Bibs - 12
Fixtures
Use/Nature COMMI 6-unit Multifamily* One story units with attached garages.
of Work
Coffee Maker
lnt Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
6 Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
#
Conn. Type
Size
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$26,910.00
r;;tu'
$0.00
$546.00 0 Permit Voided I
Parcelld #
Plan Approval
Permit Fees
Issued By
Date 07/24/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 118
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.