Loading...
HomeMy WebLinkAbout0120674-Building (windows/door) o OSHKOSH ON THE WATER Job Address 1255 SPRUCE ST CITY OF OSHKOSH No 120674 BUILDING PERMIT - APPLICATION AND RECORD Owner JOE H DELlEUIROSE M DAVID Create Date 07/21/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze ~ Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR 1 REPLACE 5 WINDOWS AND FRONT DOOR ON HOUSE, NO STRUCTURAL CHANGES of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,500.00 Plan Approval Issued By: t5rr7LJ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 07/21/2006 Final/O.P. 00/00/0000_ D_~':!:!1~! Voided I Parcelld # 1204760000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and sure any necessary approvals before starting such activity. I Date 9-lz i (t) G I Signature Address Agent/Owner OSHKOSH WI 54901 - 3649 Telephone Number t!Z& .' ,$7.1- c; To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.