Loading...
HomeMy WebLinkAbout0120667-Plumbing o OSHKOSH ON THE WATER Job Address 240 OHIO ST CITY OF OSHKOSH No 120667 PLUMBING PERMIT - APPLICATION AND RECORD Owner BROS LLC Create Date 07/18/2006 Category 440 - Industrial-Interior Plan G2-205-0706-P Water Softner Wait. St. Shamp Sink Coffee Maker 2 Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink 0 Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve 0 Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn 2 Serv Sink Soda Disp Contractor WATTERS PLUMBING Bathtub Shower Whirlpool Floor Drain Lavatory 3 Lndry Tray Toilet 3 Disposal Res. Sink Dishwasher Bar Sink 1 Sump Pump Water Heater 1 Classrm Sink Site Drain 1 Breakrm Sink Roof Drain Ejector/Grind Misc. 6 Hose Bibb Fixtures Use/Nature of Work Plumbing for new commercial building ***Check #63025 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 9060021600 Valuation $10,641.00 Plan Approval $0.00 Permit Fees $154.00 0 Permit Voided I Issued By Date 07/21/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 Address PO BOX 118 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.