HomeMy WebLinkAbout0120667-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 240 OHIO ST
CITY OF OSHKOSH
No
120667
PLUMBING PERMIT - APPLICATION AND RECORD
Owner BROS LLC Create Date 07/18/2006
Category 440 - Industrial-Interior Plan G2-205-0706-P
Water Softner Wait. St. Shamp Sink Coffee Maker
2 Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink 0 Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
0 Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn 2 Serv Sink Soda Disp
Contractor WATTERS PLUMBING
Bathtub Shower
Whirlpool Floor Drain
Lavatory 3 Lndry Tray
Toilet 3 Disposal
Res. Sink Dishwasher
Bar Sink 1 Sump Pump
Water Heater 1 Classrm Sink
Site Drain 1 Breakrm Sink
Roof Drain Ejector/Grind
Misc. 6 Hose Bibb
Fixtures
Use/Nature
of Work
Plumbing for new commercial building ***Check #63025
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
9060021600
Valuation
$10,641.00
Plan Approval
$0.00
Permit Fees
$154.00 0 Permit Voided I
Issued By
Date 07/21/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
MENASHA
WI 54952 - 0118 Telephone Number 920-733-8125
Address PO BOX 118
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.