Loading...
HomeMy WebLinkAbout0120676-Building (foundation) e OSHKOSH ON THE WATER Job Address 711 BAY SHORE DR CITY OF OSHKOSH No 120676 BUILDING PERMIT - APPLICATION AND RECORD Owner HEALTH CARE REIT I NC Create Date 07/19/2006 Designer Contractor GANTHER CONSTRUCTION Category 131 - Multi-Family Addition Plan U7-77-0706 Type . Building o Sign o Canopy o Fence o Raze Size irreg Zoning R5 Class of Const: VBibc Unfinished/Basement Sq.Ft. Rooms Height Ft. D Projection I Canopies Finished/Living 11084 Sq. Ft. Sq.Ft. Bedrooms 17 Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain Height Permit Not Required Not Required # Dwelling Units o # Structures Park Dedication Use/Nature CBRF/ Addition to CBRF, 17 Bedroom, 24 Residents to existing 20 Bed/30 Resident CBRF. Foundation Only. of Work HV AC Contractor CONDON TOTAL COMFORT Plumbing Contractor O'NEILL ENTERPRISES INC Electric Contractor SUBURBAN ELECTRICAL ENGINEERING IN Fees: Valuation $46,800.00 Plan Approval $0.00 Permit Fee Paid $254.00 Park Dedication $0.00 Issued By: Date 07/21/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0805860100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit . tion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ecessa approvals before starting such activity. Date Signature Address 4825 CTY TRK A Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4774 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.