HomeMy WebLinkAbout0120676-Building (foundation)
e
OSHKOSH
ON THE WATER
Job Address 711 BAY SHORE DR
CITY OF OSHKOSH No 120676
BUILDING PERMIT - APPLICATION AND RECORD
Owner HEALTH CARE REIT I NC Create Date 07/19/2006
Designer
Contractor
GANTHER CONSTRUCTION
Category
131 - Multi-Family Addition
Plan U7-77-0706
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Size irreg
Zoning
R5
Class of Const: VBibc
Unfinished/Basement
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
11084 Sq. Ft.
Sq.Ft.
Bedrooms
17
Stories
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain
Height Permit Not Required
Not Required
# Dwelling Units
o
# Structures
Park Dedication
Use/Nature CBRF/ Addition to CBRF, 17 Bedroom, 24 Residents to existing 20 Bed/30 Resident CBRF. Foundation Only.
of Work
HV AC Contractor
CONDON TOTAL COMFORT
Plumbing Contractor
O'NEILL ENTERPRISES INC
Electric Contractor SUBURBAN ELECTRICAL ENGINEERING IN
Fees: Valuation
$46,800.00 Plan Approval
$0.00 Permit Fee Paid
$254.00 Park Dedication
$0.00
Issued By:
Date 07/21/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0805860100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit . tion within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ecessa approvals before starting such activity.
Date
Signature
Address 4825 CTY TRK A
Agent/Owner
OSHKOSH
WI 54901 - 0000 Telephone Number 426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.