Loading...
HomeMy WebLinkAbout0120638 B o OSHKOSH ON THE WATER Job Address 1655 OHIO ST CITY OF OSHKOSH No 120638 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT J GETCHEL Create Date 07/05/2006 Contractor SALZER SIDING Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Sq. Ft. Sq. Ft. Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature BFR / REPLACE 22 DOUBLE HUNG WINDOWS IN THE SAME SIZE AND LOCATION, NO STRUCTURAL CHANGES of Work Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $9,600.00 Plan Approval Issued By: ~,l...t) $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Date 07/20/2006 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1302250000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure~~n.~9nece~;.a" a~.8~Ova,lS befO~ing such activity. Signature ~~4 ,.~/- /'" /~ ,.. Agent/Owner ---I .Z? /t: Date' /'" .~c:/7 Address PO BOX 825 OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.