HomeMy WebLinkAbout0120638 B
o
OSHKOSH
ON THE WATER
Job Address 1655 OHIO ST
CITY OF OSHKOSH No 120638
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT J GETCHEL Create Date 07/05/2006
Contractor SALZER SIDING
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Canopies
Finished/Living
Sq. Ft.
Sq. Ft.
Bedrooms
Stories
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature BFR / REPLACE 22 DOUBLE HUNG WINDOWS IN THE SAME SIZE AND LOCATION, NO STRUCTURAL CHANGES
of Work
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation $9,600.00 Plan Approval
Issued By: ~,l...t)
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Date 07/20/2006
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 1302250000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure~~n.~9nece~;.a" a~.8~Ova,lS befO~ing such activity.
Signature ~~4 ,.~/- /'" /~
,.. Agent/Owner
---I .Z? /t:
Date' /'" .~c:/7
Address
PO BOX 825
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.