Loading...
HomeMy WebLinkAbout0120645-Plumbing (laterals) G OSHKOSH ON THE WATER Job Address 3171 ELK RIDGE DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 120645 Owner MIDWEST GENERAL CONTRACTORS Create Date 07/20/2006 Contractor RADTKE CONTRACTORS INC Category 430 - Industrial-Exterior (laterals) Plan G2-194-0606-P Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink EjectorlGrind Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Ilnstall sewer and water laterals for new MFB "".Debit Account of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Issued By Size Material Plastic Sanitary Sewer 4" Type Lateral # Conn. Type New $500.00 $0.00 Permit Fees Parcel Id # Plan Approval Storm Sewer Water Service 2" Plastic Lateral New Date 07/20/2006 $100.00 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 6408 CROSS RD AgenUOwner WINNECONNE WI 54986 - 9731 Telephone Number (920) 582-4114 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.