Loading...
HomeMy WebLinkAbout0120639-Building (siding & windows) o OSHKOSH ON THE WATER Job Address 2370 ALLERTON DR CITY OF OSHKOSH No 120639 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEUCHERYL L PINNO Create Date 07/05/2006 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Sq. Ft. Bedrooms Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR / REPLACE VINYL SIDING, 6 WINDOWS (SAME SIZE & LOCATION) INSTALL SOFFIT, FASCIA AND NEW GUTTERS, NO of Work TRUCTURAL CHANGES HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $7,700.00 Plan Approval Issued By: ~~) $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Date 07/20/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1318020000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu:,..,~~,~::;:'~' appJ.O.ll1ls fore,starting such activity. Signature /,'/ f. <"I Date ..-/7 ~ '.-/?/? /~~ . ;::> Address PO BOX 825 Agent/Owner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.