Loading...
HomeMy WebLinkAbout0120602-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1234 GRAND ST PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 120602 Owner THOMAS G PUTZER Create Date 07/19/2006 Plan Category 411 - Residential-Water Heaters Contractor KOCH PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Wait. st. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Di~posal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs rental/ replace water heater **debt acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1507170000 Plan Approval $0.00 Permit Fees $25.00 D Permit Voided I Valuation $600.00 Issued By 9 YY1 LJ Date 07/19/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2005 DOTY ST OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.